Energy
In December 2011, the Client Cementarnica Usje, awarded to BAR E.C.E. the contract for performing Detailed Design for wastewater treatment plant for storm and surface waters. This project is follow-up of the previously performed Feasibility and EIA Studies for the same treatment plant.
Project main features are:
The Detailed Design was completed and submitted to the Client in March 2012, approved by the authorized technical review company.