You are here:Home > News > HMS "Debarsko Pole""

HMS "Debarsko Pole""

BCPBAR E.C.E. signed Service Contract for Preparation of a study and design for rehabilitation of the hydro melioration system (HMS)” Debarsko Pole” with the Ministry of Agriculture Forestry and Water Economy, Administration for Water Economy as a beneficiary.

The duration of this assignment is 12 months, until April 2017.


The objective of this assignment is to develop technical documentation for the rehabilitation of the hydro melioration system (HMS)” Debarsko Pole”. The Project outputs are:

  1. Preparation of Study for Rehabilitation of HMS "Debarsko Poke", and 
  2. Preparation of design for HMS "Debarsko Pole"